N1-EMELINE Ave Off over Carbonera Creek
GoodSanta Cruz County, California · 05-SCR-001-16.49 · Structure no. 36 0061S
- Built
- 2008
- 17 years old
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 119 ft
- 1 main span
- Daily traffic
- 30,000
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
N1-EMELINE Ave Off over Carbonera Creek is a prestressed concrete stringer/multi-beam or girder carrying N1-EMELINE Ave Off over Carbonera Creek in Santa Cruz County, California. It was built in 2008, so it is 17 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 30,000 vehicles a day, roughly 4% of them trucks, projected to reach 43,327 by 2043. The structure is 119 ft (36.3 m) long and 27 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N1-EMELINE Ave Off over Carbonera Creek built?
It was built in 2008, making it 17 years old in 2025.
What condition is N1-EMELINE Ave Off over Carbonera Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does N1-EMELINE Ave Off over Carbonera Creek carry?
About 30,000 vehicles per day (2019 count), of which roughly 4% are trucks.
How long is N1-EMELINE Ave Off over Carbonera Creek?
The structure is 119 ft (36.3 m) long with a longest span of 114 ft (34.8 m) and a deck 27 ft wide.
Who owns N1-EMELINE Ave Off over Carbonera Creek?
It is owned by the State Highway Agency.