US Bridges

Serra Way over Penitencia Creek

Good

Santa Clara County, California · At Abel ST · Structure no. 37C0760

Built
1962
63 years old
Condition
Good
inspected December 2024
Type
Culvert
Concrete Continuous
Length
25 ft
2 main spans
Daily traffic
11,434
2011 count
Owner
City
City or Municipal Highway Agency

About this bridge

Serra Way over Penitencia Creek is a concrete continuous culvert carrying Serra Way over Penitencia Creek in Santa Clara County, California. It was built in 1962, so it is 63 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,434 vehicles a day, roughly 12% of them trucks, projected to reach 18,661 by 2044. The structure is 25 ft (7.6 m) long and 92 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSerra Way
CrossesPenitencia Creek
LocationAt Abel ST
RouteCity Street 0
Coordinates37.42768, -121.90862
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44.6 US tons
Inventory rating26.8 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length25 ft (7.6 m)
Longest span12 ft (3.7 m)
Deck width92 ft (28 m)
Roadway width66 ft (20.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,434 (2011)
Projected traffic18,661 by 2044
Trucks12%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Serra Way over Penitencia Creek built?

It was built in 1962, making it 63 years old in 2025.

What condition is Serra Way over Penitencia Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does Serra Way over Penitencia Creek carry?

About 11,434 vehicles per day (2011 count), of which roughly 12% are trucks.

How long is Serra Way over Penitencia Creek?

The structure is 25 ft (7.6 m) long with a longest span of 12 ft (3.7 m) and a deck 92 ft wide.

Who owns Serra Way over Penitencia Creek?

It is owned by the City or Municipal Highway Agency.