Alum Rock Ave over Silver Creek
GoodSanta Clara County, California · 10 Ft SW of Checkers DR · Structure no. 37C0729
- Built
- 2006
- 19 years old
- Condition
- Good
- inspected April 2022
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 61 ft
- 1 main span
- Daily traffic
- 28,500
- 2009 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Alum Rock Ave over Silver Creek is a prestressed concrete box beam or girders - multiple carrying Alum Rock Ave over Silver Creek in Santa Clara County, California. It was built in 2006, so it is 19 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 28,500 vehicles a day, roughly 2% of them trucks, projected to reach 45,608 by 2044. The structure is 61 ft (18.7 m) long and 100 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Alum Rock Ave over Silver Creek built?
It was built in 2006, making it 19 years old in 2025.
What condition is Alum Rock Ave over Silver Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2022.
How much traffic does Alum Rock Ave over Silver Creek carry?
About 28,500 vehicles per day (2009 count), of which roughly 2% are trucks.
How long is Alum Rock Ave over Silver Creek?
The structure is 61 ft (18.7 m) long with a longest span of 60 ft (18.2 m) and a deck 100 ft wide.
Who owns Alum Rock Ave over Silver Creek?
It is owned by the City or Municipal Highway Agency.