Gilroy Hot Sprg RD over Hunting Hollow Creek
GoodSanta Clara County, California · 0.7 MI N Canada RD · Structure no. 37C0538
- Built
- 1940
- 85 years old
- Condition
- Good
- inspected November 2024
- Type
- Slab
- Concrete Continuous
- Length
- 87 ft
- 3 main spans
- Daily traffic
- 120
- 2014 count
- Owner
- County
- County Highway Agency
About this bridge
Gilroy Hot Sprg RD over Hunting Hollow Creek is a concrete continuous slab carrying Gilroy Hot Sprg RD over Hunting Hollow Creek in Santa Clara County, California. It was built in 1940, so it is 85 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 120 vehicles a day, roughly 5% of them trucks, projected to reach 169 by 2044. The structure is 87 ft (26.5 m) long and 23 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Gilroy Hot Sprg RD over Hunting Hollow Creek built?
It was built in 1940, making it 85 years old in 2025.
What condition is Gilroy Hot Sprg RD over Hunting Hollow Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does Gilroy Hot Sprg RD over Hunting Hollow Creek carry?
About 120 vehicles per day (2014 count), of which roughly 5% are trucks.
How long is Gilroy Hot Sprg RD over Hunting Hollow Creek?
The structure is 87 ft (26.5 m) long with a longest span of 29 ft (8.8 m) and a deck 23 ft wide.
Who owns Gilroy Hot Sprg RD over Hunting Hollow Creek?
It is owned by the County Highway Agency.