US Bridges

Great Mall Parkway over Penetencia Creek

Fair

Santa Clara County, California · SE of Elmwood Corctnl · Structure no. 37C0434

Built
1965
60 years old, rebuilt 1994
Condition
Fair
inspected December 2024
Type
Culvert
Concrete Continuous
Length
32 ft
3 main spans
Daily traffic
9,500
2012 count
Owner
City
City or Municipal Highway Agency

About this bridge

Great Mall Parkway over Penetencia Creek is a concrete continuous culvert carrying Great Mall Parkway over Penetencia Creek in Santa Clara County, California. It was built in 1965 and reconstructed in 1994, so it is 60 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 9,500 vehicles a day, roughly 4% of them trucks, projected to reach 12,489 by 2044. The structure is 32 ft (9.8 m) long. If it were closed, the detour would be 2.5 mi (4 km).

CarriesGreat Mall Parkway
CrossesPenetencia Creek
LocationSE of Elmwood Corctnl
RouteCity Street 0
Coordinates37.41598, -121.90534
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44.6 US tons
Inventory rating26.8 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans3
Design loadUnknown
Structure length32 ft (9.8 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,500 (2012)
Projected traffic12,489 by 2044
Trucks4%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Great Mall Parkway over Penetencia Creek built?

It was built in 1965, making it 60 years old in 2025. It was reconstructed in 1994.

What condition is Great Mall Parkway over Penetencia Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.

How much traffic does Great Mall Parkway over Penetencia Creek carry?

About 9,500 vehicles per day (2012 count), of which roughly 4% are trucks.

How long is Great Mall Parkway over Penetencia Creek?

The structure is 32 ft (9.8 m) long with a longest span of 10 ft (3 m).

Who owns Great Mall Parkway over Penetencia Creek?

It is owned by the City or Municipal Highway Agency.