Fremont Ave over Permanente Creek
GoodSanta Clara County, California · Just West of Miramonte · Structure no. 37C0422
- Built
- 2016
- 9 years old
- Condition
- Good
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 88 ft
- 1 main span
- Daily traffic
- 14,369
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Fremont Ave over Permanente Creek is a prestressed concrete stringer/multi-beam or girder carrying Fremont Ave over Permanente Creek in Santa Clara County, California. It was built in 2016, so it is 9 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 14,369 vehicles a day, roughly 4% of them trucks, projected to reach 24,484 by 2046. The structure is 88 ft (26.8 m) long and 41 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Fremont Ave over Permanente Creek built?
It was built in 2016, making it 9 years old in 2025.
What condition is Fremont Ave over Permanente Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does Fremont Ave over Permanente Creek carry?
About 14,369 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Fremont Ave over Permanente Creek?
The structure is 88 ft (26.8 m) long with a longest span of 77 ft (23.5 m) and a deck 41 ft wide.
Who owns Fremont Ave over Permanente Creek?
It is owned by the City or Municipal Highway Agency.