Creekside Way over Los Gatos Creek
FairSanta Clara County, California · Intx With Campisi Way · Structure no. 37C0360
- Built
- 1989
- 36 years old
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 172 ft
- 3 main spans
- Daily traffic
- 11,509
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Creekside Way over Los Gatos Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying Creekside Way over Los Gatos Creek in Santa Clara County, California. It was built in 1989, so it is 36 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11,509 vehicles a day, roughly 3% of them trucks, projected to reach 33,842 by 2045. The structure is 172 ft (52.4 m) long and 53 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Creekside Way over Los Gatos Creek built?
It was built in 1989, making it 36 years old in 2025.
What condition is Creekside Way over Los Gatos Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Creekside Way over Los Gatos Creek carry?
About 11,509 vehicles per day (2020 count), of which roughly 3% are trucks.
How long is Creekside Way over Los Gatos Creek?
The structure is 172 ft (52.4 m) long with a longest span of 70 ft (21.3 m) and a deck 53 ft wide.
Who owns Creekside Way over Los Gatos Creek?
It is owned by the City or Municipal Highway Agency.