US Bridges

Amphitheatre Pkwy over Permanente Creek

Fair

Santa Clara County, California · 0.3 MI N/O Charleston RD · Structure no. 37C0345

Built
1987
38 years old
Condition
Fair
inspected January 2022
Type
Slab
Concrete Continuous
Length
93 ft
3 main spans
Daily traffic
4,000
2013 count
Owner
City
City or Municipal Highway Agency

About this bridge

Amphitheatre Pkwy over Permanente Creek is a concrete continuous slab carrying Amphitheatre Pkwy over Permanente Creek in Santa Clara County, California. It was built in 1987, so it is 38 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,000 vehicles a day, roughly 5% of them trucks, projected to reach 5,205 by 2044. The structure is 93 ft (28.3 m) long and 78 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesAmphitheatre Pkwy
CrossesPermanente Creek
Location0.3 MI N/O Charleston RD
RouteCity Street 0
Coordinates37.42335, -122.08671
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length93 ft (28.3 m)
Longest span30 ft (9.1 m)
Deck width78 ft (23.9 m)
Roadway width65 ft (19.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,000 (2013)
Projected traffic5,205 by 2044
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Amphitheatre Pkwy over Permanente Creek built?

It was built in 1987, making it 38 years old in 2025.

What condition is Amphitheatre Pkwy over Permanente Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2022.

How much traffic does Amphitheatre Pkwy over Permanente Creek carry?

About 4,000 vehicles per day (2013 count), of which roughly 5% are trucks.

How long is Amphitheatre Pkwy over Permanente Creek?

The structure is 93 ft (28.3 m) long with a longest span of 30 ft (9.1 m) and a deck 78 ft wide.

Who owns Amphitheatre Pkwy over Permanente Creek?

It is owned by the City or Municipal Highway Agency.