US Bridges

Comer Way over Calabazas Creek

Fair

Santa Clara County, California · West of Pierce RD · Structure no. 37C0292

Built
1971
54 years old
Condition
Fair
inspected May 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
34 ft
1 main span
Daily traffic
460
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Comer Way over Calabazas Creek is a steel stringer/multi-beam or girder carrying Comer Way over Calabazas Creek in Santa Clara County, California. It was built in 1971, so it is 54 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 460 vehicles a day, roughly 1% of them trucks, projected to reach 1,095 by 2045. The structure is 34 ft (10.4 m) long and 29 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesComer Way
CrossesCalabazas Creek
LocationWest of Pierce RD
RouteCity Street 0
Coordinates37.27902, -122.0396
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating49.6 US tons
Inventory rating29.7 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length34 ft (10.4 m)
Longest span32 ft (9.8 m)
Deck width29 ft (8.8 m)
Roadway width29 ft (8.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic460 (2020)
Projected traffic1,095 by 2045
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Comer Way over Calabazas Creek built?

It was built in 1971, making it 54 years old in 2025.

What condition is Comer Way over Calabazas Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.

How much traffic does Comer Way over Calabazas Creek carry?

About 460 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is Comer Way over Calabazas Creek?

The structure is 34 ft (10.4 m) long with a longest span of 32 ft (9.8 m) and a deck 29 ft wide.

Who owns Comer Way over Calabazas Creek?

It is owned by the City or Municipal Highway Agency.