US Bridges

San Antonio Vly RD over Beaureguard Creek

Fair

Santa Clara County, California · 1.0 MI S Del Puerto RD · Structure no. 37C0091

Built
1965
60 years old, rebuilt 1985
Condition
Fair
inspected April 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
60 ft
2 main spans
Daily traffic
50
2014 count
Owner
County
County Highway Agency

About this bridge

San Antonio Vly RD over Beaureguard Creek is a steel stringer/multi-beam or girder carrying San Antonio Vly RD over Beaureguard Creek in Santa Clara County, California. It was built in 1965 and reconstructed in 1985, so it is 60 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50 vehicles a day, roughly 5% of them trucks, projected to reach 167 by 2044. The structure is 60 ft (18.2 m) long and 31 ft wide. If it were closed, the detour would be 70.2 mi (113 km).

CarriesSan Antonio Vly RD
CrossesBeaureguard Creek
Location1.0 MI S Del Puerto RD
RouteCounty Highway 0
Coordinates37.37777, -121.48527
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry7: Better than present minimum criteria
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47.2 US tons
Inventory rating28.2 US tons

Structure

MaterialSteel
DeckCorrugated steel
Main spans2
Design loadUnknown
Structure length60 ft (18.2 m)
Longest span27 ft (8.3 m)
Deck width31 ft (9.6 m)
Roadway width31 ft (9.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2014)
Projected traffic167 by 2044
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed70.2 mi (113 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was San Antonio Vly RD over Beaureguard Creek built?

It was built in 1965, making it 60 years old in 2025. It was reconstructed in 1985.

What condition is San Antonio Vly RD over Beaureguard Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does San Antonio Vly RD over Beaureguard Creek carry?

About 50 vehicles per day (2014 count), of which roughly 5% are trucks.

How long is San Antonio Vly RD over Beaureguard Creek?

The structure is 60 ft (18.2 m) long with a longest span of 27 ft (8.3 m) and a deck 31 ft wide.

Who owns San Antonio Vly RD over Beaureguard Creek?

It is owned by the County Highway Agency.