E&W237-S880 Ramp over S880-TASMAN DR Off Ramp
FairSanta Clara County, California · 04-SCL-237-9.50-MPS · Structure no. 37 0627H
- Built
- 2004
- 21 years old
- Condition
- Fair
- inspected April 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 615 ft
- 4 main spans
- Daily traffic
- 15,400
- 2004 count
- Owner
- State
- State Highway Agency
About this bridge
E&W237-S880 Ramp over S880-TASMAN DR Off Ramp is a prestressed concrete continuous box beam or girders - multiple carrying E&W237-S880 Ramp over S880-TASMAN DR Off Ramp in Santa Clara County, California. It was built in 2004, so it is 21 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,400 vehicles a day, roughly 5% of them trucks, projected to reach 20,814 by 2042. The structure is 615 ft (187.6 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E&W237-S880 Ramp over S880-TASMAN DR Off Ramp built?
It was built in 2004, making it 21 years old in 2025.
What condition is E&W237-S880 Ramp over S880-TASMAN DR Off Ramp in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does E&W237-S880 Ramp over S880-TASMAN DR Off Ramp carry?
About 15,400 vehicles per day (2004 count), of which roughly 5% are trucks.
How long is E&W237-S880 Ramp over S880-TASMAN DR Off Ramp?
The structure is 615 ft (187.6 m) long with a longest span of 185 ft (56.4 m) and a deck 42 ft wide.
Who owns E&W237-S880 Ramp over S880-TASMAN DR Off Ramp?
It is owned by the State Highway Agency.