Dixon LANDING-S880 over Penitencia Creek
FairSanta Clara County, California · 04-SCL-880-10.38-MPS · Structure no. 37 0582K
- Built
- 2002
- 23 years old
- Condition
- Fair
- inspected March 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 299 ft
- 3 main spans
- Daily traffic
- 1,500
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
Dixon LANDING-S880 over Penitencia Creek is a prestressed concrete continuous box beam or girders - multiple carrying Dixon LANDING-S880 over Penitencia Creek in Santa Clara County, California. It was built in 2002, so it is 23 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,500 vehicles a day, roughly 5% of them trucks, projected to reach 2,500 by 2041. The structure is 299 ft (91 m) long and 39 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Dixon LANDING-S880 over Penitencia Creek built?
It was built in 2002, making it 23 years old in 2025.
What condition is Dixon LANDING-S880 over Penitencia Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Dixon LANDING-S880 over Penitencia Creek carry?
About 1,500 vehicles per day (2019 count), of which roughly 5% are trucks.
How long is Dixon LANDING-S880 over Penitencia Creek?
The structure is 299 ft (91 m) long with a longest span of 112 ft (34 m) and a deck 39 ft wide.
Who owns Dixon LANDING-S880 over Penitencia Creek?
It is owned by the State Highway Agency.