US Bridges

N&S17-N85 Connectr over Los Gatos Creek

Good

Santa Clara County, California · 04-SCL-017-9.42-LGTS · Structure no. 37 0491H

Built
1994
31 years old
Condition
Good
inspected July 2022
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
177 ft
2 main spans
Daily traffic
15,100
2013 count
Owner
State
State Highway Agency

About this bridge

N&S17-N85 Connectr over Los Gatos Creek is a prestressed concrete continuous box beam or girders - multiple carrying N&S17-N85 Connectr over Los Gatos Creek in Santa Clara County, California. It was built in 1994, so it is 31 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 15,100 vehicles a day, roughly 1% of them trucks, projected to reach 19,995 by 2044. The structure is 177 ft (53.9 m) long and 42 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesN&S17-N85 Connectr
CrossesLos Gatos Creek
Location04-SCL-017-9.42-LGTS
RouteState Highway 17
Coordinates37.25794, -121.96104
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating43.5 US tons
Inventory rating31.1 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length177 ft (53.9 m)
Longest span89 ft (27 m)
Deck width42 ft (12.9 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15,100 (2013)
Projected traffic19,995 by 2044
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was N&S17-N85 Connectr over Los Gatos Creek built?

It was built in 1994, making it 31 years old in 2025.

What condition is N&S17-N85 Connectr over Los Gatos Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2022.

How much traffic does N&S17-N85 Connectr over Los Gatos Creek carry?

About 15,100 vehicles per day (2013 count), of which roughly 1% are trucks.

How long is N&S17-N85 Connectr over Los Gatos Creek?

The structure is 177 ft (53.9 m) long with a longest span of 89 ft (27 m) and a deck 42 ft wide.

Who owns N&S17-N85 Connectr over Los Gatos Creek?

It is owned by the State Highway Agency.