Via Real over Carpinteria Creek
GoodSanta Barbara County, California · 0.2 MI S Casitas Pass RD · Structure no. 51C0338
- Built
- 2020
- 5 years old
- Condition
- Good
- inspected February 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 146 ft
- 1 main span
- Daily traffic
- 4,000
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Via Real over Carpinteria Creek is a prestressed concrete box beam or girders - multiple carrying Via Real over Carpinteria Creek in Santa Barbara County, California. It was built in 2020, so it is 5 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,000 vehicles a day, roughly 2% of them trucks, projected to reach 7,334 by 2044. The structure is 146 ft (44.4 m) long and 43 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Via Real over Carpinteria Creek built?
It was built in 2020, making it 5 years old in 2025.
What condition is Via Real over Carpinteria Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does Via Real over Carpinteria Creek carry?
About 4,000 vehicles per day (2020 count), of which roughly 2% are trucks.
How long is Via Real over Carpinteria Creek?
The structure is 146 ft (44.4 m) long with a longest span of 143 ft (43.6 m) and a deck 43 ft wide.
Who owns Via Real over Carpinteria Creek?
It is owned by the City or Municipal Highway Agency.