US Bridges

Taylor Street over Blosser Channel

Good

Santa Barbara County, California · @ Blosser Road · Structure no. 51C0333

Built
1975
50 years old, rebuilt 1991
Condition
Good
inspected January 2023
Type
Slab
Concrete
Length
35 ft
1 main span
Daily traffic
4,600
2010 count
Owner
City
City or Municipal Highway Agency

About this bridge

Taylor Street over Blosser Channel is a concrete slab carrying Taylor Street over Blosser Channel in Santa Barbara County, California. It was built in 1975 and reconstructed in 1991, so it is 50 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,600 vehicles a day, roughly 2% of them trucks, projected to reach 10,724 by 2040. The structure is 35 ft (10.8 m) long and 56 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesTaylor Street
CrossesBlosser Channel
Location@ Blosser Road
RouteCity Street 0
Coordinates34.97506, -120.45331
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length35 ft (10.8 m)
Longest span33 ft (10.2 m)
Deck width56 ft (17.1 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,600 (2010)
Projected traffic10,724 by 2040
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Taylor Street over Blosser Channel built?

It was built in 1975, making it 50 years old in 2025. It was reconstructed in 1991.

What condition is Taylor Street over Blosser Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.

How much traffic does Taylor Street over Blosser Channel carry?

About 4,600 vehicles per day (2010 count), of which roughly 2% are trucks.

How long is Taylor Street over Blosser Channel?

The structure is 35 ft (10.8 m) long with a longest span of 33 ft (10.2 m) and a deck 56 ft wide.

Who owns Taylor Street over Blosser Channel?

It is owned by the City or Municipal Highway Agency.