Alamar Ave over Mission Creek
GoodSanta Barbara County, California · South of State ST · Structure no. 51C0243
- Built
- 1930
- 95 years old, rebuilt 1979
- Condition
- Good
- inspected March 2023
- Type
- Tee Beam
- Concrete
- Length
- 47 ft
- 1 main span
- Daily traffic
- 6,200
- 2010 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Alamar Ave over Mission Creek is a concrete tee beam carrying Alamar Ave over Mission Creek in Santa Barbara County, California. It was built in 1930 and reconstructed in 1979, so it is 95 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,200 vehicles a day, roughly 5% of them trucks, projected to reach 11,437 by 2040. The structure is 47 ft (14.2 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Alamar Ave over Mission Creek built?
It was built in 1930, making it 95 years old in 2025. It was reconstructed in 1979.
What condition is Alamar Ave over Mission Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does Alamar Ave over Mission Creek carry?
About 6,200 vehicles per day (2010 count), of which roughly 5% are trucks.
How long is Alamar Ave over Mission Creek?
The structure is 47 ft (14.2 m) long with a longest span of 40 ft (12.2 m) and a deck 43 ft wide.
Who owns Alamar Ave over Mission Creek?
It is owned by the City or Municipal Highway Agency.