Carrillo ST over Mission Creek
FairSanta Barbara County, California · West of Castillo ST · Structure no. 51C0147
- Built
- 1963
- 62 years old, rebuilt 1989
- Condition
- Fair
- inspected March 2023
- Type
- Tee Beam
- Concrete
- Length
- 32 ft
- 1 main span
- Daily traffic
- 30,000
- 2009 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Carrillo ST over Mission Creek is a concrete tee beam carrying Carrillo ST over Mission Creek in Santa Barbara County, California. It was built in 1963 and reconstructed in 1989, so it is 62 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 30,000 vehicles a day, roughly 2% of them trucks, projected to reach 35,009 by 2043. The structure is 32 ft (9.7 m) long and 92 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Carrillo ST over Mission Creek built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1989.
What condition is Carrillo ST over Mission Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Carrillo ST over Mission Creek carry?
About 30,000 vehicles per day (2009 count), of which roughly 2% are trucks.
How long is Carrillo ST over Mission Creek?
The structure is 32 ft (9.7 m) long with a longest span of 30 ft (9.1 m) and a deck 92 ft wide.
Who owns Carrillo ST over Mission Creek?
It is owned by the City or Municipal Highway Agency.