Happy Canyon Road over Santa Aqueda Creek
FairSanta Barbara County, California · 2.8 MI E SR 154 · Structure no. 51C0075
- Built
- 1952
- 73 years old
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 53 ft
- 1 main span
- Daily traffic
- 873
- 2014 count
- Owner
- County
- County Highway Agency
About this bridge
Happy Canyon Road over Santa Aqueda Creek is a steel stringer/multi-beam or girder carrying Happy Canyon Road over Santa Aqueda Creek in Santa Barbara County, California. It was built in 1952, so it is 73 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 873 vehicles a day, roughly 15% of them trucks, projected to reach 1,092 by 2042. The structure is 53 ft (16.2 m) long and 25 ft wide. If it were closed, the detour would be 36 mi (58 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Happy Canyon Road over Santa Aqueda Creek built?
It was built in 1952, making it 73 years old in 2025.
What condition is Happy Canyon Road over Santa Aqueda Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Happy Canyon Road over Santa Aqueda Creek carry?
About 873 vehicles per day (2014 count), of which roughly 15% are trucks.
How long is Happy Canyon Road over Santa Aqueda Creek?
The structure is 53 ft (16.2 m) long with a longest span of 50 ft (15.2 m) and a deck 25 ft wide.
Who owns Happy Canyon Road over Santa Aqueda Creek?
It is owned by the County Highway Agency.