Hollister Ave over San Jose Creek
FairSanta Barbara County, California · 0.1 MI East Kellog Ave · Structure no. 51C0027
- Built
- 1964
- 61 years old
- Condition
- Fair
- inspected March 2023
- Type
- Slab
- Prestressed Concrete
- Length
- 44 ft
- 1 main span
- Daily traffic
- 25,445
- 2008 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Hollister Ave over San Jose Creek is a prestressed concrete slab carrying Hollister Ave over San Jose Creek in Santa Barbara County, California. It was built in 1964, so it is 61 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 25,445 vehicles a day, roughly 5% of them trucks, projected to reach 32,371 by 2043. The structure is 44 ft (13.4 m) long and 105 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Hollister Ave over San Jose Creek built?
It was built in 1964, making it 61 years old in 2025.
What condition is Hollister Ave over San Jose Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Hollister Ave over San Jose Creek carry?
About 25,445 vehicles per day (2008 count), of which roughly 5% are trucks.
How long is Hollister Ave over San Jose Creek?
The structure is 44 ft (13.4 m) long with a longest span of 42 ft (12.8 m) and a deck 105 ft wide.
Who owns Hollister Ave over San Jose Creek?
It is owned by the City or Municipal Highway Agency.