Jalama Road over Ramajal Creek
FairSanta Barbara County, California · 7.7 MI West of SR 1 · Structure no. 51C0016
- Built
- 1951
- 74 years old, rebuilt 1986
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 66 ft
- 3 main spans
- Daily traffic
- 669
- 2010 count
- Owner
- County
- County Highway Agency
About this bridge
Jalama Road over Ramajal Creek is a steel continuous stringer/multi-beam or girder carrying Jalama Road over Ramajal Creek in Santa Barbara County, California. It was built in 1951 and reconstructed in 1986, so it is 74 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 669 vehicles a day, roughly 4% of them trucks, projected to reach 764 by 2041. The structure is 66 ft (20.2 m) long and 28 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Jalama Road over Ramajal Creek built?
It was built in 1951, making it 74 years old in 2025. It was reconstructed in 1986.
What condition is Jalama Road over Ramajal Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Jalama Road over Ramajal Creek carry?
About 669 vehicles per day (2010 count), of which roughly 4% are trucks.
How long is Jalama Road over Ramajal Creek?
The structure is 66 ft (20.2 m) long with a longest span of 26 ft (7.9 m) and a deck 28 ft wide.
Who owns Jalama Road over Ramajal Creek?
It is owned by the County Highway Agency.