State Route 192 over Arroyo Paredon Creek
GoodSanta Barbara County, California · 05-SB-192-15.52 · Structure no. 51 0360
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected May 2024
- Type
- Slab
- Prestressed Concrete
- Length
- 60 ft
- 1 main span
- Daily traffic
- 2,600
- 2009 count
- Owner
- State
- State Highway Agency
About this bridge
State Route 192 over Arroyo Paredon Creek is a prestressed concrete slab carrying State Route 192 over Arroyo Paredon Creek in Santa Barbara County, California. It was built in 2019, so it is 6 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,600 vehicles a day, roughly 5% of them trucks, projected to reach 7,324 by 2042. The structure is 60 ft (18.4 m) long and 36 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was State Route 192 over Arroyo Paredon Creek built?
It was built in 2019, making it 6 years old in 2025.
What condition is State Route 192 over Arroyo Paredon Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does State Route 192 over Arroyo Paredon Creek carry?
About 2,600 vehicles per day (2009 count), of which roughly 5% are trucks.
How long is State Route 192 over Arroyo Paredon Creek?
The structure is 60 ft (18.4 m) long with a longest span of 56 ft (17.2 m) and a deck 36 ft wide.
Who owns State Route 192 over Arroyo Paredon Creek?
It is owned by the State Highway Agency.