Madera Lane over El Corte De Madera Crk
FairSan Mateo County, California · 0.1 MI N of SH 84 · Structure no. 35C0116
- Built
- 1920
- 105 years old
- Condition
- Fair
- inspected April 2024
- Type
- Tee Beam
- Concrete Continuous
- Length
- 57 ft
- 2 main spans
- Daily traffic
- 16
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
Madera Lane over El Corte De Madera Crk is a concrete continuous tee beam carrying Madera Lane over El Corte De Madera Crk in San Mateo County, California. It was built in 1920, so it is 105 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 16 vehicles a day, roughly 7% of them trucks, projected to reach 53 by 2042. The structure is 57 ft (17.5 m) long and 22 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Madera Lane over El Corte De Madera Crk built?
It was built in 1920, making it 105 years old in 2025.
What condition is Madera Lane over El Corte De Madera Crk in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Madera Lane over El Corte De Madera Crk carry?
About 16 vehicles per day (2018 count), of which roughly 7% are trucks.
How long is Madera Lane over El Corte De Madera Crk?
The structure is 57 ft (17.5 m) long with a longest span of 38 ft (11.6 m) and a deck 22 ft wide.
Who owns Madera Lane over El Corte De Madera Crk?
It is owned by the County Highway Agency.