US Bridges

N35-N1 Cnnctr Rmp over Lakeshire Drive

Fair

San Mateo County, California · 04-SM-035-R28.64-DLC · Structure no. 35 0206G

Built
1972
53 years old
Condition
Fair
inspected October 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
120 ft
1 main span
Daily traffic
7,300
1998 count
Owner
State
State Highway Agency

About this bridge

N35-N1 Cnnctr Rmp over Lakeshire Drive is a prestressed concrete box beam or girders - multiple carrying N35-N1 Cnnctr Rmp over Lakeshire Drive in San Mateo County, California. It was built in 1972, so it is 53 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 7,300 vehicles a day, roughly 2% of them trucks, projected to reach 23,330 by 2042. The structure is 120 ft (36.6 m) long and 41 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesN35-N1 Cnnctr Rmp
CrossesLakeshire Drive
Location04-SM-035-R28.64-DLC
RouteState Highway 35
Coordinates37.6697, -122.48308
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating99.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length120 ft (36.6 m)
Longest span118 ft (36 m)
Deck width41 ft (12.5 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,300 (1998)
Projected traffic23,330 by 2042
Trucks2%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was N35-N1 Cnnctr Rmp over Lakeshire Drive built?

It was built in 1972, making it 53 years old in 2025.

What condition is N35-N1 Cnnctr Rmp over Lakeshire Drive in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does N35-N1 Cnnctr Rmp over Lakeshire Drive carry?

About 7,300 vehicles per day (1998 count), of which roughly 2% are trucks.

How long is N35-N1 Cnnctr Rmp over Lakeshire Drive?

The structure is 120 ft (36.6 m) long with a longest span of 118 ft (36 m) and a deck 41 ft wide.

Who owns N35-N1 Cnnctr Rmp over Lakeshire Drive?

It is owned by the State Highway Agency.