US Bridges

John Daly Blvd over Interstate 280 SR 1

Fair

San Mateo County, California · 04-SM-280-M27.17L-DLC · Structure no. 35 0172

Built
1965
60 years old, rebuilt 2001
Condition
Fair
inspected February 2025
Type
Box Beam or Girders - Multiple
Concrete Continuous
Length
386 ft
4 main spans
Daily traffic
29,660
2002 count
Owner
State
State Highway Agency

About this bridge

John Daly Blvd over Interstate 280 SR 1 is a concrete continuous box beam or girders - multiple carrying John Daly Blvd over Interstate 280 SR 1 in San Mateo County, California. It was built in 1965 and reconstructed in 2001, so it is 60 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 29,660 vehicles a day, roughly 2% of them trucks, projected to reach 39,753 by 2047. The structure is 386 ft (117.7 m) long and 114 ft wide.

CarriesJohn Daly Blvd
CrossesInterstate 280 SR 1
Location04-SM-280-M27.17L-DLC
RouteCity Street 0D005
Coordinates37.7047, -122.47231
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating87.5 US tons
Inventory rating52.5 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length386 ft (117.7 m)
Longest span110 ft (33.5 m)
Deck width114 ft (34.8 m)
Roadway width99 ft (30.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic29,660 (2002)
Projected traffic39,753 by 2047
Trucks2%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was John Daly Blvd over Interstate 280 SR 1 built?

It was built in 1965, making it 60 years old in 2025. It was reconstructed in 2001.

What condition is John Daly Blvd over Interstate 280 SR 1 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.

How much traffic does John Daly Blvd over Interstate 280 SR 1 carry?

About 29,660 vehicles per day (2002 count), of which roughly 2% are trucks.

How long is John Daly Blvd over Interstate 280 SR 1?

The structure is 386 ft (117.7 m) long with a longest span of 110 ft (33.5 m) and a deck 114 ft wide.

Who owns John Daly Blvd over Interstate 280 SR 1?

It is owned by the State Highway Agency.