Quailwood Lane over Los Berros Creek
GoodSan Luis Obispo County, California · By Los Berros Road · Structure no. 49C0475
- Built
- 1932
- 93 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 42 ft
- 1 main span
- Daily traffic
- 10
- 2016 count
- Owner
- County
- County Highway Agency
About this bridge
Quailwood Lane over Los Berros Creek is a concrete stringer/multi-beam or girder carrying Quailwood Lane over Los Berros Creek in San Luis Obispo County, California. It was built in 1932, so it is 93 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 10 vehicles a day, roughly 3% of them trucks, projected to reach 12 by 2044. The structure is 42 ft (12.9 m) long and 23 ft wide. If it were closed, the detour would be 61.5 mi (99 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Quailwood Lane over Los Berros Creek built?
It was built in 1932, making it 93 years old in 2025.
What condition is Quailwood Lane over Los Berros Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does Quailwood Lane over Los Berros Creek carry?
About 10 vehicles per day (2016 count), of which roughly 3% are trucks.
How long is Quailwood Lane over Los Berros Creek?
The structure is 42 ft (12.9 m) long with a longest span of 37 ft (11.4 m) and a deck 23 ft wide.
Who owns Quailwood Lane over Los Berros Creek?
It is owned by the County Highway Agency.