Foothill Blvd over Stenner Creek
GoodSan Luis Obispo County, California · 0.1MI East of SR 1 · Structure no. 49C0440
- Built
- 2005
- 20 years old
- Condition
- Good
- inspected April 2024
- Type
- Slab
- Prestressed Concrete
- Length
- 51 ft
- 1 main span
- Daily traffic
- 5,000
- 2004 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Foothill Blvd over Stenner Creek is a prestressed concrete slab carrying Foothill Blvd over Stenner Creek in San Luis Obispo County, California. It was built in 2005, so it is 20 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,000 vehicles a day, roughly 1% of them trucks, projected to reach 8,189 by 2046. The structure is 51 ft (15.6 m) long and 78 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Foothill Blvd over Stenner Creek built?
It was built in 2005, making it 20 years old in 2025.
What condition is Foothill Blvd over Stenner Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does Foothill Blvd over Stenner Creek carry?
About 5,000 vehicles per day (2004 count), of which roughly 1% are trucks.
How long is Foothill Blvd over Stenner Creek?
The structure is 51 ft (15.6 m) long with a longest span of 31 ft (9.6 m) and a deck 78 ft wide.
Who owns Foothill Blvd over Stenner Creek?
It is owned by the City or Municipal Highway Agency.