US Bridges

Main ST over Morro Creek

Fair

San Luis Obispo County, California · 0.15 MI S of RTE 41 · Structure no. 49C0334

Built
1921
104 years old, rebuilt 1955
Condition
Fair
inspected May 2023
Type
Tee Beam
Concrete Continuous
Length
55 ft
2 main spans
Daily traffic
8,500
2011 count
Owner
City
City or Municipal Highway Agency

About this bridge

Main ST over Morro Creek is a concrete continuous tee beam carrying Main ST over Morro Creek in San Luis Obispo County, California. It was built in 1921 and reconstructed in 1955, so it is 104 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 8,500 vehicles a day, roughly 4% of them trucks, projected to reach 15,354 by 2045. The structure is 55 ft (16.8 m) long and 37 ft wide. If it were closed, the detour would be 4.3 mi (7 km).

CarriesMain ST
CrossesMorro Creek
Location0.15 MI S of RTE 41
RouteCity Street 0
Coordinates35.37821, -120.85434
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating26.5 US tons
Inventory rating19.3 US tons

Structure

Structure typeTee Beam
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length55 ft (16.8 m)
Longest span26 ft (7.9 m)
Deck width37 ft (11.4 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,500 (2011)
Projected traffic15,354 by 2045
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed4.3 mi (7 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Main ST over Morro Creek built?

It was built in 1921, making it 104 years old in 2025. It was reconstructed in 1955.

What condition is Main ST over Morro Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does Main ST over Morro Creek carry?

About 8,500 vehicles per day (2011 count), of which roughly 4% are trucks.

How long is Main ST over Morro Creek?

The structure is 55 ft (16.8 m) long with a longest span of 26 ft (7.9 m) and a deck 37 ft wide.

Who owns Main ST over Morro Creek?

It is owned by the City or Municipal Highway Agency.