Morada Lane over Mosher Slough
FairSan Joaquin County, California · 1 Mile W of Route 99 · Structure no. 29C0424
- Built
- 2007
- 18 years old
- Condition
- Fair
- inspected December 2023
- Type
- Slab
- Concrete
- Length
- 47 ft
- 1 main span
- Daily traffic
- 13,800
- 2015 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Morada Lane over Mosher Slough is a concrete slab carrying Morada Lane over Mosher Slough in San Joaquin County, California. It was built in 2007, so it is 18 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 13,800 vehicles a day, roughly 4% of them trucks, projected to reach 21,663 by 2045. The structure is 47 ft (14.3 m) long and 103 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Morada Lane over Mosher Slough built?
It was built in 2007, making it 18 years old in 2025.
What condition is Morada Lane over Mosher Slough in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does Morada Lane over Mosher Slough carry?
About 13,800 vehicles per day (2015 count), of which roughly 4% are trucks.
How long is Morada Lane over Mosher Slough?
The structure is 47 ft (14.3 m) long with a longest span of 47 ft (14.3 m) and a deck 103 ft wide.
Who owns Morada Lane over Mosher Slough?
It is owned by the City or Municipal Highway Agency.