Bethany Road over W. Side Irrigation Canal
FairSan Joaquin County, California · 0.6 MI East of Byron Road · Structure no. 29C0421
- Built
- 2005
- 20 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 110 ft
- 1 main span
- Daily traffic
- 271
- 2013 count
- Owner
- County
- County Highway Agency
About this bridge
Bethany Road over W. Side Irrigation Canal is a prestressed concrete stringer/multi-beam or girder carrying Bethany Road over W. Side Irrigation Canal in San Joaquin County, California. It was built in 2005, so it is 20 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 271 vehicles a day, roughly 5% of them trucks, projected to reach 583 by 2046. The structure is 110 ft (33.4 m) long and 35 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bethany Road over W. Side Irrigation Canal built?
It was built in 2005, making it 20 years old in 2025.
What condition is Bethany Road over W. Side Irrigation Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Bethany Road over W. Side Irrigation Canal carry?
About 271 vehicles per day (2013 count), of which roughly 5% are trucks.
How long is Bethany Road over W. Side Irrigation Canal?
The structure is 110 ft (33.4 m) long with a longest span of 108 ft (32.9 m) and a deck 35 ft wide.
Who owns Bethany Road over W. Side Irrigation Canal?
It is owned by the County Highway Agency.