Jack Tone RD over North Fork Coyote Creek
GoodSan Joaquin County, California · .4 MI N of Liberty RD · Structure no. 29C0280
- Built
- 1959
- 66 years old, rebuilt 1980
- Condition
- Good
- inspected January 2024
- Type
- Slab
- Concrete Continuous
- Length
- 39 ft
- 2 main spans
- Daily traffic
- 117
- 2013 count
- Owner
- County
- County Highway Agency
About this bridge
Jack Tone RD over North Fork Coyote Creek is a concrete continuous slab carrying Jack Tone RD over North Fork Coyote Creek in San Joaquin County, California. It was built in 1959 and reconstructed in 1980, so it is 66 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 117 vehicles a day, roughly 12% of them trucks, projected to reach 130 by 2046. The structure is 39 ft (11.9 m) long and 25 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Jack Tone RD over North Fork Coyote Creek built?
It was built in 1959, making it 66 years old in 2025. It was reconstructed in 1980.
What condition is Jack Tone RD over North Fork Coyote Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does Jack Tone RD over North Fork Coyote Creek carry?
About 117 vehicles per day (2013 count), of which roughly 12% are trucks.
How long is Jack Tone RD over North Fork Coyote Creek?
The structure is 39 ft (11.9 m) long with a longest span of 19 ft (5.8 m) and a deck 25 ft wide.
Who owns Jack Tone RD over North Fork Coyote Creek?
It is owned by the County Highway Agency.