US Bridges

El Dorado ST over Mosher Slough

Fair

San Joaquin County, California · 0.2 MI N Glencannon ST · Structure no. 29C0239

Built
1969
56 years old
Condition
Fair
inspected December 2023
Type
Slab
Concrete Continuous
Length
62 ft
2 main spans
Daily traffic
9,676
2011 count
Owner
City
City or Municipal Highway Agency

About this bridge

El Dorado ST over Mosher Slough is a concrete continuous slab carrying El Dorado ST over Mosher Slough in San Joaquin County, California. It was built in 1969, so it is 56 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 9,676 vehicles a day, roughly 1% of them trucks, projected to reach 10,688 by 2045. The structure is 62 ft (18.9 m) long and 83 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesEl Dorado ST
CrossesMosher Slough
Location0.2 MI N Glencannon ST
RouteCity Street 0
Coordinates38.02809, -121.3161
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating69.3 US tons
Inventory rating41.8 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length62 ft (18.9 m)
Longest span30 ft (9.1 m)
Deck width83 ft (25.2 m)
Roadway width64 ft (19.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,676 (2011)
Projected traffic10,688 by 2045
Trucks1%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was El Dorado ST over Mosher Slough built?

It was built in 1969, making it 56 years old in 2025.

What condition is El Dorado ST over Mosher Slough in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.

How much traffic does El Dorado ST over Mosher Slough carry?

About 9,676 vehicles per day (2011 count), of which roughly 1% are trucks.

How long is El Dorado ST over Mosher Slough?

The structure is 62 ft (18.9 m) long with a longest span of 30 ft (9.1 m) and a deck 83 ft wide.

Who owns El Dorado ST over Mosher Slough?

It is owned by the City or Municipal Highway Agency.