Center ST over Stockton Channel
PoorSan Joaquin County, California · N of Weber ST · Structure no. 29C0189
- Built
- 1949
- 76 years old
- Condition
- Poor
- inspected January 2025
- Type
- Slab
- Concrete Continuous
- Length
- 168 ft
- 11 main spans
- Daily traffic
- 7,000
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Center ST over Stockton Channel is a concrete continuous slab carrying Center ST over Stockton Channel in San Joaquin County, California. It was built in 1949, so it is 76 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 7,000 vehicles a day, roughly 5% of them trucks, projected to reach 9,024 by 2045. The structure is 168 ft (51.2 m) long and 82 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Center ST over Stockton Channel built?
It was built in 1949, making it 76 years old in 2025.
What condition is Center ST over Stockton Channel in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in January 2025.
How much traffic does Center ST over Stockton Channel carry?
About 7,000 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Center ST over Stockton Channel?
The structure is 168 ft (51.2 m) long with a longest span of 15 ft (4.6 m) and a deck 82 ft wide.
Who owns Center ST over Stockton Channel?
It is owned by the City or Municipal Highway Agency.