Lower Sac RD over Pixley Slough
FairSan Joaquin County, California · N of 8 Mile RD · Structure no. 29C0137
- Built
- 1926
- 99 years old, rebuilt 1940
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 60 ft
- 2 main spans
- Daily traffic
- 11,122
- 2013 count
- Owner
- County
- County Highway Agency
About this bridge
Lower Sac RD over Pixley Slough is a steel continuous stringer/multi-beam or girder carrying Lower Sac RD over Pixley Slough in San Joaquin County, California. It was built in 1926 and reconstructed in 1940, so it is 99 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11,122 vehicles a day, roughly 5% of them trucks, projected to reach 13,235 by 2045. The structure is 60 ft (18.3 m) long and 28 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lower Sac RD over Pixley Slough built?
It was built in 1926, making it 99 years old in 2025. It was reconstructed in 1940.
What condition is Lower Sac RD over Pixley Slough in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does Lower Sac RD over Pixley Slough carry?
About 11,122 vehicles per day (2013 count), of which roughly 5% are trucks.
How long is Lower Sac RD over Pixley Slough?
The structure is 60 ft (18.3 m) long with a longest span of 29 ft (8.8 m) and a deck 28 ft wide.
Who owns Lower Sac RD over Pixley Slough?
It is owned by the County Highway Agency.