US Bridges

99 Frontage RD W over Pixley Slough

Fair

San Joaquin County, California · 0.6 MI S Armstrong RD · Structure no. 29C0070

Built
1964
61 years old
Condition
Fair
inspected September 2023
Type
Slab
Concrete Continuous
Length
60 ft
2 main spans
Daily traffic
3,498
2013 count
Owner
County
County Highway Agency

About this bridge

99 Frontage RD W over Pixley Slough is a concrete continuous slab carrying 99 Frontage RD W over Pixley Slough in San Joaquin County, California. It was built in 1964, so it is 61 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 3,498 vehicles a day, roughly 15% of them trucks, projected to reach 10,055 by 2045. The structure is 60 ft (18.3 m) long and 32 ft wide. If it were closed, the detour would be 5 mi (8 km).

Carries99 Frontage RD W
CrossesPixley Slough
Location0.6 MI S Armstrong RD
RouteCounty Highway 0
Coordinates38.07787, -121.26017
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating72.9 US tons
Inventory rating43.5 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length60 ft (18.3 m)
Longest span29 ft (8.8 m)
Deck width32 ft (9.7 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,498 (2013)
Projected traffic10,055 by 2045
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 99 Frontage RD W over Pixley Slough built?

It was built in 1964, making it 61 years old in 2025.

What condition is 99 Frontage RD W over Pixley Slough in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does 99 Frontage RD W over Pixley Slough carry?

About 3,498 vehicles per day (2013 count), of which roughly 15% are trucks.

How long is 99 Frontage RD W over Pixley Slough?

The structure is 60 ft (18.3 m) long with a longest span of 29 ft (8.8 m) and a deck 32 ft wide.

Who owns 99 Frontage RD W over Pixley Slough?

It is owned by the County Highway Agency.