US Bridges

Interstate 5 NB over State Route 12

Fair

San Joaquin County, California · 10-SJ-005-39.55 · Structure no. 29 0255R

Built
1979
46 years old
Condition
Fair
inspected March 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
208 ft
2 main spans
Daily traffic
38,500
2009 count
Owner
State
State Highway Agency

About this bridge

Interstate 5 NB over State Route 12 is a prestressed concrete continuous box beam or girders - multiple carrying Interstate 5 NB over State Route 12 in San Joaquin County, California. It was built in 1979, so it is 46 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 38,500 vehicles a day, roughly 21% of them trucks, projected to reach 63,485 by 2041. The structure is 208 ft (63.4 m) long and 55 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesInterstate 5 NB
CrossesState Route 12
Location10-SJ-005-39.55
RouteInterstate 5
Coordinates38.11575, -121.39756
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length208 ft (63.4 m)
Longest span103 ft (31.5 m)
Deck width55 ft (16.7 m)
Roadway width51 ft (15.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic38,500 (2009)
Projected traffic63,485 by 2041
Trucks21%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Interstate 5 NB over State Route 12 built?

It was built in 1979, making it 46 years old in 2025.

What condition is Interstate 5 NB over State Route 12 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does Interstate 5 NB over State Route 12 carry?

About 38,500 vehicles per day (2009 count), of which roughly 21% are trucks.

How long is Interstate 5 NB over State Route 12?

The structure is 208 ft (63.4 m) long with a longest span of 103 ft (31.5 m) and a deck 55 ft wide.

Who owns Interstate 5 NB over State Route 12?

It is owned by the State Highway Agency.