US Bridges

Interstate 5 NB over W120-S5 Conn Rmp & UP RR

Good

San Joaquin County, California · 10-SJ-005-R14.82 · Structure no. 29 0251R

Built
1971
54 years old, rebuilt 2008
Condition
Good
inspected October 2023
Type
Box Beam or Girders - Multiple
Concrete Continuous
Length
465 ft
5 main spans
Daily traffic
71,500
2010 count
Owner
State
State Highway Agency

About this bridge

Interstate 5 NB over W120-S5 Conn Rmp & UP RR is a concrete continuous box beam or girders - multiple carrying Interstate 5 NB over W120-S5 Conn Rmp & UP RR in San Joaquin County, California. It was built in 1971 and reconstructed in 2008, so it is 54 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 71,500 vehicles a day, roughly 17% of them trucks, projected to reach 143,722 by 2043. The structure is 465 ft (141.7 m) long and 70 ft wide. If it were closed, the detour would be 21.1 mi (34 km).

CarriesInterstate 5 NB
CrossesW120-S5 Conn Rmp & UP RR
Location10-SJ-005-R14.82
RouteInterstate 5
Coordinates37.78851, -121.30189
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20 + Mod
Structure length465 ft (141.7 m)
Longest span118 ft (36 m)
Deck width70 ft (21.4 m)
Roadway width67 ft (20.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic71,500 (2010)
Projected traffic143,722 by 2043
Trucks17%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed21.1 mi (34 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Interstate 5 NB over W120-S5 Conn Rmp & UP RR built?

It was built in 1971, making it 54 years old in 2025. It was reconstructed in 2008.

What condition is Interstate 5 NB over W120-S5 Conn Rmp & UP RR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Interstate 5 NB over W120-S5 Conn Rmp & UP RR carry?

About 71,500 vehicles per day (2010 count), of which roughly 17% are trucks.

How long is Interstate 5 NB over W120-S5 Conn Rmp & UP RR?

The structure is 465 ft (141.7 m) long with a longest span of 118 ft (36 m) and a deck 70 ft wide.

Who owns Interstate 5 NB over W120-S5 Conn Rmp & UP RR?

It is owned by the State Highway Agency.