E&W4-S5 Connector over Church Street
FairSan Joaquin County, California · 10-SJ-004-R16.00-STKN · Structure no. 29 0231H
- Built
- 1972
- 53 years old
- Condition
- Fair
- inspected June 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 108 ft
- 1 main span
- Daily traffic
- 19,400
- 2000 count
- Owner
- State
- State Highway Agency
About this bridge
E&W4-S5 Connector over Church Street is a prestressed concrete box beam or girders - multiple carrying E&W4-S5 Connector over Church Street in San Joaquin County, California. It was built in 1972, so it is 53 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 19,400 vehicles a day, roughly 8% of them trucks, projected to reach 31,311 by 2041. The structure is 108 ft (32.9 m) long and 56 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E&W4-S5 Connector over Church Street built?
It was built in 1972, making it 53 years old in 2025.
What condition is E&W4-S5 Connector over Church Street in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does E&W4-S5 Connector over Church Street carry?
About 19,400 vehicles per day (2000 count), of which roughly 8% are trucks.
How long is E&W4-S5 Connector over Church Street?
The structure is 108 ft (32.9 m) long with a longest span of 105 ft (32 m) and a deck 56 ft wide.
Who owns E&W4-S5 Connector over Church Street?
It is owned by the State Highway Agency.