Interstate 5 NB over BNSF RY & AMTRAK
FairSan Joaquin County, California · 10-SJ-005-25.78-STKN · Structure no. 29 0230R
- Built
- 1972
- 53 years old
- Condition
- Fair
- inspected August 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 141 ft
- 1 main span
- Daily traffic
- 43,750
- 2009 count
- Owner
- State
- State Highway Agency
About this bridge
Interstate 5 NB over BNSF RY & AMTRAK is a prestressed concrete box beam or girders - multiple carrying Interstate 5 NB over BNSF RY & AMTRAK in San Joaquin County, California. It was built in 1972, so it is 53 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 43,750 vehicles a day, roughly 24% of them trucks, projected to reach 83,109 by 2041. The structure is 141 ft (43 m) long and 102 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Interstate 5 NB over BNSF RY & AMTRAK built?
It was built in 1972, making it 53 years old in 2025.
What condition is Interstate 5 NB over BNSF RY & AMTRAK in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Interstate 5 NB over BNSF RY & AMTRAK carry?
About 43,750 vehicles per day (2009 count), of which roughly 24% are trucks.
How long is Interstate 5 NB over BNSF RY & AMTRAK?
The structure is 141 ft (43 m) long with a longest span of 141 ft (43 m) and a deck 102 ft wide.
Who owns Interstate 5 NB over BNSF RY & AMTRAK?
It is owned by the State Highway Agency.