N5-MARCH LN Offrmp over Ebmud Aqueduct
GoodSan Joaquin County, California · 10-SJ-005-29.83 · Structure no. 29 0226S
- Built
- 1970
- 55 years old, rebuilt 1997
- Condition
- Good
- inspected January 2025
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 256 ft
- 4 main spans
- Daily traffic
- 10,800
- 1998 count
- Owner
- State
- State Highway Agency
About this bridge
N5-MARCH LN Offrmp over Ebmud Aqueduct is a concrete continuous box beam or girders - multiple carrying N5-MARCH LN Offrmp over Ebmud Aqueduct in San Joaquin County, California. It was built in 1970 and reconstructed in 1997, so it is 55 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 10,800 vehicles a day, roughly 6% of them trucks, projected to reach 22,248 by 2047. The structure is 256 ft (78 m) long and 52 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N5-MARCH LN Offrmp over Ebmud Aqueduct built?
It was built in 1970, making it 55 years old in 2025. It was reconstructed in 1997.
What condition is N5-MARCH LN Offrmp over Ebmud Aqueduct in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does N5-MARCH LN Offrmp over Ebmud Aqueduct carry?
About 10,800 vehicles per day (1998 count), of which roughly 6% are trucks.
How long is N5-MARCH LN Offrmp over Ebmud Aqueduct?
The structure is 256 ft (78 m) long with a longest span of 91 ft (27.7 m) and a deck 52 ft wide.
Who owns N5-MARCH LN Offrmp over Ebmud Aqueduct?
It is owned by the State Highway Agency.