Ramp/Connector 5 over Carlton Ave
FairSan Joaquin County, California · 10-SJ-005-27.66-STKN · Structure no. 29 0198S
- Built
- 1970
- 55 years old, rebuilt 2003
- Condition
- Fair
- inspected August 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 118 ft
- 1 main span
- Daily traffic
- 1,750
- 2009 count
- Owner
- State
- State Highway Agency
About this bridge
Ramp/Connector 5 over Carlton Ave is a prestressed concrete box beam or girders - multiple carrying Ramp/Connector 5 over Carlton Ave in San Joaquin County, California. It was built in 1970 and reconstructed in 2003, so it is 55 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,750 vehicles a day, roughly 2% of them trucks, projected to reach 2,091 by 2041. The structure is 118 ft (36 m) long and 29 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ramp/Connector 5 over Carlton Ave built?
It was built in 1970, making it 55 years old in 2025. It was reconstructed in 2003.
What condition is Ramp/Connector 5 over Carlton Ave in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Ramp/Connector 5 over Carlton Ave carry?
About 1,750 vehicles per day (2009 count), of which roughly 2% are trucks.
How long is Ramp/Connector 5 over Carlton Ave?
The structure is 118 ft (36 m) long with a longest span of 117 ft (35.8 m) and a deck 29 ft wide.
Who owns Ramp/Connector 5 over Carlton Ave?
It is owned by the State Highway Agency.