Fulton Ave over Milgeo Ave SR 99 UPRR
FairSan Joaquin County, California · 10-SJ-099-1.71 · Structure no. 29 0185
- Built
- 1968
- 57 years old
- Condition
- Fair
- inspected October 2024
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 330 ft
- 5 main spans
- Daily traffic
- 950
- 2016 count
- Owner
- State
- State Highway Agency
About this bridge
Fulton Ave over Milgeo Ave SR 99 UPRR is a concrete continuous box beam or girders - multiple carrying Fulton Ave over Milgeo Ave SR 99 UPRR in San Joaquin County, California. It was built in 1968, so it is 57 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 950 vehicles a day, roughly 1% of them trucks, projected to reach 3,283 by 2042. The structure is 330 ft (100.5 m) long and 39 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Fulton Ave over Milgeo Ave SR 99 UPRR built?
It was built in 1968, making it 57 years old in 2025.
What condition is Fulton Ave over Milgeo Ave SR 99 UPRR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Fulton Ave over Milgeo Ave SR 99 UPRR carry?
About 950 vehicles per day (2016 count), of which roughly 1% are trucks.
How long is Fulton Ave over Milgeo Ave SR 99 UPRR?
The structure is 330 ft (100.5 m) long with a longest span of 74 ft (22.6 m) and a deck 39 ft wide.
Who owns Fulton Ave over Milgeo Ave SR 99 UPRR?
It is owned by the State Highway Agency.