Interstate 5 NB over Weber Pershing Fremont
PoorSan Joaquin County, California · 10-SJ-005-26.47-STKN · Structure no. 29 0176R
- Built
- 1972
- 53 years old
- Condition
- Poor
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 2,725 ft
- 14 main spans
- Daily traffic
- 56,500
- 2009 count
- Owner
- State
- State Highway Agency
About this bridge
Interstate 5 NB over Weber Pershing Fremont is a steel stringer/multi-beam or girder carrying Interstate 5 NB over Weber Pershing Fremont in San Joaquin County, California. It was built in 1972, so it is 53 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 56,500 vehicles a day, roughly 23% of them trucks, projected to reach 113,673 by 2041. The structure is 2,725 ft (830.6 m) long and 68 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Interstate 5 NB over Weber Pershing Fremont built?
It was built in 1972, making it 53 years old in 2025.
What condition is Interstate 5 NB over Weber Pershing Fremont in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in August 2023.
How much traffic does Interstate 5 NB over Weber Pershing Fremont carry?
About 56,500 vehicles per day (2009 count), of which roughly 23% are trucks.
How long is Interstate 5 NB over Weber Pershing Fremont?
The structure is 2,725 ft (830.6 m) long with a longest span of 360 ft (109.7 m) and a deck 68 ft wide.
Who owns Interstate 5 NB over Weber Pershing Fremont?
It is owned by the State Highway Agency.