E205-N5 Connector over Paradise Cut
GoodSan Joaquin County, California · 10-SJ-205-R13.11 · Structure no. 29 0032G
- Built
- 1970
- 55 years old, rebuilt 2010
- Condition
- Good
- inspected April 2024
- Type
- Tee Beam
- Concrete Continuous
- Length
- 421 ft
- 10 main spans
- Daily traffic
- 21,500
- 1998 count
- Owner
- State
- State Highway Agency
About this bridge
E205-N5 Connector over Paradise Cut is a concrete continuous tee beam carrying E205-N5 Connector over Paradise Cut in San Joaquin County, California. It was built in 1970 and reconstructed in 2010, so it is 55 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 21,500 vehicles a day, roughly 2% of them trucks, projected to reach 64,517 by 2042. The structure is 421 ft (128.4 m) long and 58 ft wide. If it were closed, the detour would be 23 mi (37 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E205-N5 Connector over Paradise Cut built?
It was built in 1970, making it 55 years old in 2025. It was reconstructed in 2010.
What condition is E205-N5 Connector over Paradise Cut in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does E205-N5 Connector over Paradise Cut carry?
About 21,500 vehicles per day (1998 count), of which roughly 2% are trucks.
How long is E205-N5 Connector over Paradise Cut?
The structure is 421 ft (128.4 m) long with a longest span of 44 ft (13.4 m) and a deck 58 ft wide.
Who owns E205-N5 Connector over Paradise Cut?
It is owned by the State Highway Agency.