WB80-FREMONT ST over Esx Harr Clem Folsom 1st
GoodSan Francisco County, California · 04-SF-080-5.62R-SF · Structure no. 34 0127S
- Built
- 2008
- 17 years old
- Condition
- Good
- inspected February 2025
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 1,803 ft
- 16 main spans
- Daily traffic
- 27,500
- 2014 count
- Owner
- State
- State Highway Agency
About this bridge
WB80-FREMONT ST over Esx Harr Clem Folsom 1st is a prestressed concrete continuous box beam or girders - single or spread carrying WB80-FREMONT ST over Esx Harr Clem Folsom 1st in San Francisco County, California. It was built in 2008, so it is 17 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 27,500 vehicles a day, roughly 5% of them trucks, projected to reach 37,913 by 2045. The structure is 1,803 ft (549.6 m) long and 39 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was WB80-FREMONT ST over Esx Harr Clem Folsom 1st built?
It was built in 2008, making it 17 years old in 2025.
What condition is WB80-FREMONT ST over Esx Harr Clem Folsom 1st in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.
How much traffic does WB80-FREMONT ST over Esx Harr Clem Folsom 1st carry?
About 27,500 vehicles per day (2014 count), of which roughly 5% are trucks.
How long is WB80-FREMONT ST over Esx Harr Clem Folsom 1st?
The structure is 1,803 ft (549.6 m) long with a longest span of 133 ft (40.5 m) and a deck 39 ft wide.
Who owns WB80-FREMONT ST over Esx Harr Clem Folsom 1st?
It is owned by the State Highway Agency.