US Bridges

Monterey Bl WB on over Bosworth & SB280 Onramp

Fair

San Francisco County, California · 04-SF-280-R2.87-SF · Structure no. 34 0091

Built
1964
61 years old
Condition
Fair
inspected April 2024
Type
Box Beam or Girders - Multiple
Concrete Continuous
Length
527 ft
6 main spans
Daily traffic
8,133
2019 count
Owner
State
State Highway Agency

About this bridge

Monterey Bl WB on over Bosworth & SB280 Onramp is a concrete continuous box beam or girders - multiple carrying Monterey Bl WB on over Bosworth & SB280 Onramp in San Francisco County, California. It was built in 1964, so it is 61 years old, older than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 8,133 vehicles a day, roughly 1% of them trucks, projected to reach 6,179 by 2044. The structure is 527 ft (160.6 m) long and 25 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesMonterey Bl WB on
CrossesBosworth & SB280 Onramp
Location04-SF-280-R2.87-SF
RouteCity Street 0D055
Coordinates37.73273, -122.4339
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating84.7 US tons
Inventory rating50.7 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans6
Design loadHS 20 + Mod
Structure length527 ft (160.6 m)
Longest span123 ft (37.5 m)
Deck width25 ft (7.7 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,133 (2019)
Projected traffic6,179 by 2044
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Monterey Bl WB on over Bosworth & SB280 Onramp built?

It was built in 1964, making it 61 years old in 2025.

What condition is Monterey Bl WB on over Bosworth & SB280 Onramp in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does Monterey Bl WB on over Bosworth & SB280 Onramp carry?

About 8,133 vehicles per day (2019 count), of which roughly 1% are trucks.

How long is Monterey Bl WB on over Bosworth & SB280 Onramp?

The structure is 527 ft (160.6 m) long with a longest span of 123 ft (37.5 m) and a deck 25 ft wide.

Who owns Monterey Bl WB on over Bosworth & SB280 Onramp?

It is owned by the State Highway Agency.