US Bridges

Alta Road over Oniel Canyon

Good

San Diego County, California · 1.6MI N/O Otay Mesa Road · Structure no. 57C0745

Built
1990
35 years old
Condition
Good
inspected November 2022
Type
Culvert
Concrete Continuous
Length
36 ft
3 main spans
Daily traffic
634
2016 count
Owner
County
County Highway Agency

About this bridge

Alta Road over Oniel Canyon is a concrete continuous culvert carrying Alta Road over Oniel Canyon in San Diego County, California. It was built in 1990, so it is 35 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 634 vehicles a day, roughly 2% of them trucks, projected to reach 768 by 2040. The structure is 36 ft (11 m) long. If it were closed, the detour would be 11.8 mi (19 km).

CarriesAlta Road
CrossesOniel Canyon
Location1.6MI N/O Otay Mesa Road
RouteCounty Highway 0
Coordinates32.58664, -116.92638
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans3
Design loadUnknown
Structure length36 ft (11 m)
Longest span12 ft (3.6 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic634 (2016)
Projected traffic768 by 2040
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed11.8 mi (19 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Alta Road over Oniel Canyon built?

It was built in 1990, making it 35 years old in 2025.

What condition is Alta Road over Oniel Canyon in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2022.

How much traffic does Alta Road over Oniel Canyon carry?

About 634 vehicles per day (2016 count), of which roughly 2% are trucks.

How long is Alta Road over Oniel Canyon?

The structure is 36 ft (11 m) long with a longest span of 12 ft (3.6 m).

Who owns Alta Road over Oniel Canyon?

It is owned by the County Highway Agency.