US Bridges

Third Avenue over Otay River Tributary

Good

San Diego County, California · 125 Ft S/O Orange ST · Structure no. 57C0661

Built
1987
38 years old
Condition
Good
inspected February 2023
Type
Culvert
Concrete Continuous
Length
28 ft
3 main spans
Daily traffic
17,580
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Third Avenue over Otay River Tributary is a concrete continuous culvert carrying Third Avenue over Otay River Tributary in San Diego County, California. It was built in 1987, so it is 38 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 17,580 vehicles a day, roughly 1% of them trucks, projected to reach 22,469 by 2045. The structure is 28 ft (8.5 m) long and 88 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesThird Avenue
CrossesOtay River Tributary
Location125 Ft S/O Orange ST
RouteCity Street 0
Coordinates32.6013, -117.06465
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans3
Design loadUnknown
Structure length28 ft (8.5 m)
Longest span8 ft (2.4 m)
Deck width88 ft (26.8 m)
Roadway width68 ft (20.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,580 (2023)
Projected traffic22,469 by 2045
Trucks1%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Third Avenue over Otay River Tributary built?

It was built in 1987, making it 38 years old in 2025.

What condition is Third Avenue over Otay River Tributary in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does Third Avenue over Otay River Tributary carry?

About 17,580 vehicles per day (2023 count), of which roughly 1% are trucks.

How long is Third Avenue over Otay River Tributary?

The structure is 28 ft (8.5 m) long with a longest span of 8 ft (2.4 m) and a deck 88 ft wide.

Who owns Third Avenue over Otay River Tributary?

It is owned by the City or Municipal Highway Agency.