Poinsettia Lane over Nctd BNSF RY & AMTRAK
GoodSan Diego County, California · 0.35 MI W/O Route I-5 · Structure no. 57C0598
- Built
- 1983
- 42 years old, rebuilt 2002
- Condition
- Good
- inspected August 2023
- Type
- Slab
- Prestressed Concrete
- Length
- 142 ft
- 3 main spans
- Daily traffic
- 4,500
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Poinsettia Lane over Nctd BNSF RY & AMTRAK is a prestressed concrete slab carrying Poinsettia Lane over Nctd BNSF RY & AMTRAK in San Diego County, California. It was built in 1983 and reconstructed in 2002, so it is 42 years old, younger than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,500 vehicles a day, roughly 1% of them trucks, projected to reach 5,291 by 2040. The structure is 142 ft (43.3 m) long and 77 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Poinsettia Lane over Nctd BNSF RY & AMTRAK built?
It was built in 1983, making it 42 years old in 2025. It was reconstructed in 2002.
What condition is Poinsettia Lane over Nctd BNSF RY & AMTRAK in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does Poinsettia Lane over Nctd BNSF RY & AMTRAK carry?
About 4,500 vehicles per day (2017 count), of which roughly 1% are trucks.
How long is Poinsettia Lane over Nctd BNSF RY & AMTRAK?
The structure is 142 ft (43.3 m) long with a longest span of 47 ft (14.3 m) and a deck 77 ft wide.
Who owns Poinsettia Lane over Nctd BNSF RY & AMTRAK?
It is owned by the City or Municipal Highway Agency.