US Bridges

Hilltop DR over Telegraph Canyon Channel

Good

San Diego County, California · At Telegraph Cyn RD · Structure no. 57C0508

Built
1977
48 years old
Condition
Good
inspected February 2023
Type
Culvert
Concrete Continuous
Length
35 ft
3 main spans
Daily traffic
9,421
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Hilltop DR over Telegraph Canyon Channel is a concrete continuous culvert carrying Hilltop DR over Telegraph Canyon Channel in San Diego County, California. It was built in 1977, so it is 48 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,421 vehicles a day, roughly 2% of them trucks, projected to reach 10,128 by 2045. The structure is 35 ft (10.7 m) long and 80 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesHilltop DR
CrossesTelegraph Canyon Channel
LocationAt Telegraph Cyn RD
RouteCity Street 0
Coordinates32.62796, -117.06047
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans3
Design loadUnknown
Structure length35 ft (10.7 m)
Longest span10 ft (3.2 m)
Deck width80 ft (24.4 m)
Roadway width45 ft (13.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,421 (2017)
Projected traffic10,128 by 2045
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Hilltop DR over Telegraph Canyon Channel built?

It was built in 1977, making it 48 years old in 2025.

What condition is Hilltop DR over Telegraph Canyon Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does Hilltop DR over Telegraph Canyon Channel carry?

About 9,421 vehicles per day (2017 count), of which roughly 2% are trucks.

How long is Hilltop DR over Telegraph Canyon Channel?

The structure is 35 ft (10.7 m) long with a longest span of 10 ft (3.2 m) and a deck 80 ft wide.

Who owns Hilltop DR over Telegraph Canyon Channel?

It is owned by the City or Municipal Highway Agency.