Morena Blvd over Tecolote Creek Channel
GoodSan Diego County, California · 15FT Nw/O Tecolote RD · Structure no. 57C0422
- Built
- 1957
- 68 years old
- Condition
- Good
- inspected September 2024
- Type
- Slab
- Concrete
- Length
- 54 ft
- 2 main spans
- Daily traffic
- 15,540
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Morena Blvd over Tecolote Creek Channel is a concrete slab carrying Morena Blvd over Tecolote Creek Channel in San Diego County, California. It was built in 1957, so it is 68 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 15,540 vehicles a day, roughly 1% of them trucks, projected to reach 16,376 by 2041. The structure is 54 ft (16.5 m) long and 54 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Morena Blvd over Tecolote Creek Channel built?
It was built in 1957, making it 68 years old in 2025.
What condition is Morena Blvd over Tecolote Creek Channel in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does Morena Blvd over Tecolote Creek Channel carry?
About 15,540 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is Morena Blvd over Tecolote Creek Channel?
The structure is 54 ft (16.5 m) long with a longest span of 26 ft (7.9 m) and a deck 54 ft wide.
Who owns Morena Blvd over Tecolote Creek Channel?
It is owned by the City or Municipal Highway Agency.